2016_123_AF4

STAM Phase 2 in combination with Target Times

Timeline

2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Feb. '17CompletedDec. '23

Implementing Partners

Lufthansa Group
Leader: Lufthansa Group
Air France
Contributor: Air France

Description

The project aims to implement a software / systems as well as the adaptation of operational procedures used by the respective Lufthansa Group airlines and Air France in accordance with the STAM (Short Term Air Traffic Flow and Capacity Management Measures) phase 2 concepts, as well as the Target Time concept, as stated in PC IR 716/2014 in Network Collaborative Management implementation. It is fully consistent with the DP2016 families 4.1.2 STAM phase 2 and 4.3.1 Target Time for ATFCM purpose.

Both families have been integrated into a single project as both aim to comparable scopes (from an AU procedural and system perspective). This includes the consideration and impact assessment of Short term ATM Measures and Target Times throughout the flight planning and operations control, including the update of flight plans and flight schedules and the exchange of related information with the Network Manager.

Countries involved

Additional Information

  • Project Type: Airline
  • CEF Call Year: 2016
  • Civil/Military: Civil
  • Multistakeholder: Yes
  • Main AF: AF4 - Network Collaborative Management
  • Sub AF: S-AF 4.1 - Enhanced STAM
  • Progress Percentage: 100%