Timeline
Description
Concept of Operation has been developed to clarify the AGL and field infrastructure component design and architecture requirements for an integrated ASMGCS level 4/5 Surface manager (SMAN).
A holistic Options analysis and selection process is being undertaken to assess the functional and safety integrity requirement of the Ground Movement Control System as a system design that is fully congruent and potentially pre-integrated with the ASMGSC4/5 Surface Manager.
Primary Cable specification, distribution and operational architecture is being surveyed to scope design and installation of an airfield-wide GMCS primary cabling matrix to allow floating separation and necessary system integrity for automatic/.semi-automatic operation.
Existing AGL system architecture is undergoing resilience and communication architecture modification to allow for validation testing of floating separation and seamless operational transition to the new GMCS/SMAN function.
Countries involved
Additional Information
- Project Type: Airport
- CEF Call Year: 2014
- Civil/Military: Civil
- Multistakeholder: No
- Main AF: AF2 - Airport Integration and Throughput
- Sub AF: S-AF 2.5 Airport Safety Nets
- Progress Percentage: 100%