Apr. '14CompletedDec. '15

Implementing Partners

Heathrow Airport
Leader: Heathrow Airport

Description

 Concept of Operation has been developed to clarify the AGL and field infrastructure component design and architecture requirements for an integrated ASMGCS level 4/5 Surface manager (SMAN).

 A holistic Options analysis and selection process is being undertaken to assess the functional and safety integrity requirement of the Ground Movement Control System as a system design that is fully congruent and potentially pre-integrated with the ASMGSC4/5 Surface Manager.

 Primary Cable specification, distribution and operational architecture is being surveyed to scope design and installation of an airfield-wide GMCS primary cabling matrix to allow floating separation and necessary system integrity for automatic/.semi-automatic operation.

 Existing AGL system architecture is undergoing resilience and communication architecture modification to allow for validation testing of floating separation and seamless operational transition to the new GMCS/SMAN function.

Countries involved

Additional Information

  • Project Type: Airport
  • CEF Call Year: 2014
  • Civil/Military: Civil
  • Multistakeholder: No
  • Main AF: AF2 - Airport Integration and Throughput
  • Sub AF: S-AF 2.5 Airport Safety Nets
  • Progress Percentage: 100%